Information required to conduct a test with our Drag Reducing Agent

🎯 INFORMATION REQUIRED TO PERFORM A TEST WITH OUR GREEN DRA (DRAG REDUCING AGENT)

πŸ“Œ SECTION 1: PIPELINE & FLUID INFORMATION

πŸ”§ Pipeline Material
β†’ e.g. Carbon steel – API 5L

πŸ§ͺ Fluid Type & Composition
β†’ Crude oil, produced water, gas condensate
β†’ Include chemical composition

πŸ“ Pipeline Diameter & Length
β†’ Length of test zone: 500–1000 m
β†’ Diameter (specify in mm or inches)

πŸ“† Pipeline Age
β†’ Include year of installation or operational years

🧱 Internal Roughness
β†’ Frictional condition of the internal wall

🧹 Debris Composition
β†’ Indicate type: paraffin, sand, rust, biofilms, etc.


🌑️ SECTION 2: OPERATIONAL CONDITIONS

β›½ Pressure
β†’ Typically 20–60 bar (300–900 psi)

πŸ”₯ Temperature
β†’ Range: 40–80Β°C

🌊 Flow Regime
β†’ Stratified or slug flow

🏁 Flow Stability, Velocity & Pressure
β†’ Monitor Ξ”P and flow turbulence


πŸ’§ SECTION 3: WATER & EMULSION CHARACTERISTICS

βš—οΈ pH of Water Phase

πŸ§‚ TDS / Salinity

🦠 Presence of SRB (Sulfate-Reducing Bacteria)

πŸ›’οΈ Emulsions or Oil/Water Ratio
β†’ Specify percentage ratio


πŸ“¦ SECTION 4: OPERATIONAL VOLUME & DELIVERY

🚚 Volume Transported per Day
β†’ Indicate in mΒ³/day or bbl/day

πŸ’§ Type of Product Transported
β†’ API gravity, viscosity, chemical makeup

🧴 Pump System for Injection
β†’ Type and flow rate (L/min or gal/min)

πŸ“ˆ Product Flow Rate
β†’ Required for precise dosing calculations


πŸ§ͺ SECTION 5: TRIAL DESIGN & TESTING METHOD

⏳ Minimum Trial Duration
β†’ 2 to 4 days

πŸ’‰ Suggested Dose
β†’ 800 to 1000 PPM

πŸ“‰ Method of Evaluation
β†’ Ξ”P reduction
β†’ System stability (within 24–72 hours)
β†’ Observation of sediment formation or residue

πŸ§ͺ Evaluation Tools
β†’ Pressure gauges, inline sensors, flowmeters, fluid samplers


βœ… Call to Action:

🟒 Test our Green DRA Solution Today!
β†’ Biodegradable, efficient, and ESG-compliant
β†’ Contact us for tailored technical assistance
🌐 www.aloetradeamerica.com